The important thing to remember when gathering evidence is that the more evidence the better - that is, the more evidence you gather to demonstrate your skills, the more confident an assessor can be that you have learned the skills not just at one point in time, but are continuing to apply and develop those skills (as opposed to just learning for the test!). Furthermore, one piece of evidence that you collect will not usualy demonstrate all the required criteria for a unit of competency, whereas multiple overlapping pieces of evidence will usually do the trick!
From the Wiki University
What evidence can you provide to prove your understanding of each of the following citeria?
Prepare for cable installation
|
|
Prepare for given work according to industry standards Completed |
Evidence:
|
Arrange access to site according to required procedure Completed |
Evidence:
|
Inform appropriate personnel of identified hazards and safety constraints on worksite Completed |
Evidence:
|
Obtain cable installation plan and set up installation equipment according to manufacturer’s requirements Completed |
Evidence:
|
Select suitable protective clothing, tools and equipment, and safety equipment, and confirm support structures are safe Completed |
Evidence:
|
Install aerial cable lead-in
|
|
Identify and use safe support structures Completed |
Evidence:
|
Select type of cable bearer and determine need for separate catenary wire installation Completed |
Evidence:
|
Secure catenary wire or bearer wire permanently to support structure using aerial fixing devices, and adjust tension to meet relevant height and minimum sag requirements to required specifications Completed |
Evidence:
|
Secure cable safely to catenary wire, leaving cable loop on support structure Completed |
Evidence:
|
Terminate cable in client enclosure and aerial enclosure Completed |
Evidence:
|
Install underground cable lead-in
|
|
Run push rod through pipe and attach cable for hauling Completed |
Evidence:
|
Haul cable using lubricant, cable slippers or rollers to ensure no sheath damage when hauling at correct tension into and out of enclosures Completed |
Evidence:
|
Provide sufficient cable allowance in enclosures for jointing and maintenance requirements Completed |
Evidence:
|
Terminate cable in client enclosure and pit enclosure Completed |
Evidence:
|
Seal and secure cable
|
|
Seal cable ends to prevent ingress of foreign material Completed |
Evidence:
|
Secure cable loop on support structure to minimise damage to conductors Completed |
Evidence:
|
Weather seal building entry points where appropriate Completed |
Evidence:
|
Fit over voltage protection devices to all cables with metallic component where required Completed |
Evidence:
|
Complete tasks on site
|
|
Record any approved alteration to original design and return to appropriate personnel Completed |
Evidence:
|
Complete appropriate records and sign reports where required according to enterprise policy Completed |
Evidence:
|
Restore site to original condition and dispose of waste in environmentally safe manner Completed |
Evidence:
|
Notify client and obtain sign off Completed |
Evidence:
|